Client Story

Efficient Design of Plant Components Using Model-Based Dynamic Simulation

Customer

Everllence

Industry

Process Engineering

Category

Simulation, MATLAB/Simulink, Simscape Fluids

Precise simulation of a system with an axial and a radial compressor in the Basic Industries sector using MATLAB®/Simulink® and Simscape Fluids™ for efficient sizing and design.

Challenge

Ensuring Robust Support for Interpretive Decisions

Verifying that the system had been designed correctly required a precise and physically accurate calculation.

Optimize the sizing of capital-intensive components

Our client was looking for a cost-effective solution to optimize the sizing of expensive process components and avoid undersizing or oversizing.

Reduce the Costs, Risks, and Effort Associated with Real-World Testing

Real-world testing under operating conditions involves considerable effort, risk, and time. The goal was to minimize development risks early on and shorten the project timeline.

Solution

Virtual modeling of real-world system behavior using dynamic simulation in MATLAB® Simulink® and Simscape Fluids™

Together with Everllence, we developed a precise simulation model in MATLAB® Simulink® and Simscape Fluids™ that physically accurately replicates the real-world behavior of the compressors and the entire system.
To accurately model project-specific components, custom simulation blocks were implemented in collaboration with MathWorks. Furthermore, the use of the Gas Mixture Domain enables realistic simulation of complex processes involving changing gas compositions, such as condensation and mass transfer processes. Peak loads and boundary cases are also covered by the dynamic simulation.

The solution also offers the potential to evolve into a digital twin, which—by incorporating real-time sensor data—can be used to reliably and efficiently evaluate various operating conditions, design variants, and optimization approaches, and to detect errors early on.

Result

Early Virtual Testing for Greater Planning Certainty

Variants, critical operating conditions, and parameter changes can be tested virtually before commissioning—without the need for complex real-world test setups.

A reliable basis for decision-making to ensure accurate sizing and optimized design

Reliable simulation results serve as the basis for design decisions and the safe sizing of components.

Long-term reduction in wear and costs

Virtual validation and optimized sizing can reduce long-term costs associated with real-world testing and the wear and tear on plant components.

Protection Against Peak Loads Through Dynamic Simulation

Dynamic simulation accounts for peak loads that cannot be taken into account in static calculations, thereby contributing to greater plant safety and reduced wear and tear.

Faster Project Implementation

Early virtual testing enables faster variant evaluation, earlier defect detection, and a reduction in development iterations.

Reusable Simulation Model

Findings and models can be used in subsequent projects, thereby saving time and effort.

Further customer projects

Together we develop a solution that works.